Services & Pricing — Central & South-Central Missouri Defensible Data.
Decisions That Hold.
Professional soil testing, aerial mapping, and land intelligence for properties of every size. All pricing is transparent, predictable, and self-calculable.
Tier 0 Readiness Screening Not sure which service level is right? Readiness Screening front-loads clarity before you invest in comprehensive services — and most of the cost applies as a credit if you proceed.
$450 flat fee
Property Readiness Screening

A structured evaluation to identify the right tier, the right priorities, and any issues that would limit success — before you commit to a larger investment.

  • 2–4 hour property consultation
  • Desktop analysis: aerial imagery, soil surveys, public land data
  • Written readiness assessment — length determined by property complexity
  • Clear tier recommendation with rationale
  • Preliminary cost estimate for recommended service
  • Identification of issues that could limit success
Turnaround: 5–7 business days from information receipt. Desktop analysis only — no weather dependency.

$225 credit applied toward Tier 3, 4, or 5 if you proceed within 6 months of your screening. A $450 screening can prevent a $3,000–10,000 mistake.

Tiers 1–3 Soil Testing & Field Intelligence Three service tiers — Basic, Advanced, and Precision — covering properties from under 5 acres to several hundred. RGB orthomosaic is standard at every field tier. Pricing is straightforward: a base fee covers the first 20 acres, and a single per-acre rate applies to every acre above that.
How to calculate your price (properties over 20 acres) Base fee  +  (your acres − 20)  ×  band rate
1Find your acreage band below
2Subtract 20 from your acres
3Multiply by the $/ac rate for your band
4Add the base fee
Example — Tier 2, 120 acres (81–160 band, $14/ac):  $1,250 + (120 − 20) × $14  =  $1,250 + $1,400  =  $2,650
Service Tier ≤5 ac 6–10 ac 11–15 ac 16–20 ac
(base fee)
21–80 ac
$/ac over 20
81–160 ac
$/ac over 20
161–320 ac
$/ac over 20
321+ ac
Tier 1 — Basic + RGB $250$450$650$850 $850+(ac−20)×$10 $850+(ac−20)×$9 $850+(ac−20)×$8 Custom
Tier 2 — Advanced + RGB $350$650$950$1,250 $1,250+(ac−20)×$16 $1,250+(ac−20)×$14 $1,250+(ac−20)×$12 Custom
Tier 3 — Precision $450$900$1,350$1,800 $1,800+(ac−20)×$30 $1,800+(ac−20)×$27 $1,800+(ac−20)×$25 Custom
PropertyTier 1 — BasicTier 2 — AdvancedTier 3 — Precision
50 acres
21–80 band
$1,150
$850+(30×$10)
$1,730
$1,250+(30×$16)
$2,700
$1,800+(30×$30)
120 acres
81–160 band
$1,750
$850+(100×$9)
$2,650
$1,250+(100×$14)
$4,500
$1,800+(100×$27)
200 acres
161–320 band
$2,290
$850+(180×$8)
$3,410
$1,250+(180×$12)
$6,300
$1,800+(180×$25)
320 acres
161–320 band
$3,250
$850+(300×$8)
$4,850
$1,250+(300×$12)
$9,300
$1,800+(300×$25)
Tier 1 Basic Soil Testing + RGB Professional soil fertility mapping with aerial base map

Base $850  ·  21–80 ac: $10/ac  ·  81–160 ac: $9/ac  ·  161–320 ac: $8/ac

Includes
  • RGB orthomosaic — standard aerial base map of the property
  • 1 sample per 2 acres (2-acre grid sampling)
  • GPS-tagged sample locations
  • 15+ parameters: N, P, K, pH, Ca, Mg, S, micronutrients, CEC, OC, BS
  • Spatial nutrient variability maps (color-coded)
  • Management zone delineation
  • Fertilizer and lime recommendations by zone
  • Report — length determined by property and data complexity
  • Excel data with GPS coordinates
  • On-site consultation during sampling
Not included
  • GIS file outputs (GeoTIFF, KML, Shapefile) — available Tier 2+
  • Multispectral indices (NDVI, NDRE, GNDVI) — Tier 3 only
  • Compaction testing — add-on at +$5/sample

Turnaround: Standard 5–7 business days  ·  Rush +$200 or +25%

RGB flight: overcast acceptable — no rain, wind <15 mph. May extend turnaround 1–3 days.

Ideal for: Budget-conscious producers; food plot managers; establishing baseline before management changes

Tier 2 Advanced Soil Testing + RGB Premium-density analysis with compaction testing and full GIS outputs

Base $1,250  ·  21–80 ac: $16/ac  ·  81–160 ac: $14/ac  ·  161–320 ac: $12/ac

Includes
  • RGB orthomosaic — base layer for soil and compaction map overlays
  • 1 sample per acre (2× density of Tier 1)
  • Compaction testing included at all sample points
  • Higher-resolution nutrient variability maps
  • Refined management zone delineation
  • Full GIS Digital Package: GeoTIFF, KML (Google Earth/OnX), Shapefiles
  • Enhanced report — length determined by property and data complexity
  • Everything in Tier 1

Turnaround: Standard 10–14 business days  ·  Rush +$300 or +25%

RGB flight: overcast acceptable — no rain, wind <15 mph. May extend turnaround 1–3 days.

Ideal for: Rotational grazing optimization; high spatial variability; precision fertilizer application; NRCS/GIS workflows

Base $1,800  ·  21–80 ac: $30/ac  ·  81–160 ac: $27/ac  ·  161–320 ac: $25/ac

Includes
  • RGB orthomosaic — high-resolution aerial base map
  • Multispectral analysis: NDVI, NDRE, and GNDVI
  • 1 sample per acre with 4-core composites
  • Integrated analysis: soil chemistry + compaction + vegetation health
  • Topographic analysis: elevation, contours, slope, drainage
  • Infrastructure and vegetation community mapping
  • Property baseline documentation
  • Multispectral GIS outputs: GeoTIFF + PDF (NDVI, NDRE, GNDVI, RGB)
  • Comprehensive report — length commensurate with data scope
  • Everything in Tier 2

Turnaround: Standard 14–21 business days  ·  Rush +$500 or +25%

Multispectral: clear sky or consistent flat overcast required — no moving shadows. Weather-dependent scheduling.

Ideal for: Troubleshooting poor performance; pre-conversion baseline; data-driven operators

Turnaround note: All stated turnaround times begin upon completion of in-field data collection, not at project initiation. Weather-dependent flight windows may affect scheduling and will be communicated at time of booking.

321+ acres: Contact for a custom quote.

Tiers 4 & 5 Stewardship Planning & Regenerative Conversion Comprehensive planning services built on Tier 3 data. These tiers produce decision-grade management plans, multi-year roadmaps, and — in Tier 5 — a full regenerative transformation framework with carbon evaluation.

★ Private-Pay Clients Only — Not Available for NRCS EQIP/CSP or MDC Cost-Share Properties

Service Tier 50–100 acres 101–200 acres 201–320 acres 321–500 acres 500+ acres
Tier 4 — Stewardship Planning $3,500$4,500$5,500$7,000Custom
Tier 5 — Regenerative Conversion $7,000–8,000$9,000–10,000$11,000–12,500$13,000–15,000Custom
Tier 4  ·  ★ Private-Pay Only Comprehensive Stewardship Planning What to do, where, when, and what it costs — built on Tier 3 data
Includes
  • Resource concern prioritization: severity, urgency, feasibility
  • Practice recommendations with justification and expected outcomes
  • Multi-year implementation roadmap (Year 1, 2, 3+)
  • Cost estimates: materials, contractor, DIY (low/mid/high ranges)
  • Habitat and wildlife assessment: food, cover, water, connectivity
  • Hydrology and erosion management recommendations
  • Monitoring protocols
  • Comprehensive report — length commensurate with data scope
  • Everything in Tier 3
Not included
  • Official NRCS conservation plan writing
  • Engineering design for structures
  • Carbon market enrollment (see Tier 5)

Turnaround: 4–6 weeks from Tier 3 data completion

Ideal for: Complex multi-resource properties; long-term stewardship commitment; private-pay without NRCS cost-share

Tier 5  ·  ★ Private-Pay Only Regenerative Land Conversion Complete regenerative transformation roadmap with carbon evaluation
Includes
  • Enhanced soil carbon baseline (higher-density sampling)
  • Carbon market readiness evaluation: eligibility, sequestration potential, program fit, revenue projections (educational — not enrollment)
  • Regenerative system design: species selection, seed mix specs, establishment methods
  • Long-term monitoring and adaptive management protocols
  • Multi-year implementation roadmap with sequencing and cost estimates
  • Comprehensive report — length commensurate with data scope
  • Everything in Tier 4
Not included
  • Financial modeling (NPV/IRR) — refer to ag economist
  • Carbon program enrollment — refer to carbon consultant
  • Conservation easement baseline — refer to land trust

Turnaround: 6–8 weeks from Tier 3 data completion

Ideal for: Fescue-to-natives conversion; carbon market evaluation; multi-generational estate planning

Federal program note: The DJI Mavic 3 Multispectral platform is subject to NDAA/ASDA procurement restrictions and cannot be used on federally funded project components including NRCS EQIP and CSP. Missouri state programs (DNR/SWCD N590, MDC) and private-pay engagements are not restricted.

Add-Ons & Modifiers Additional Services Available as additions to standard tier engagements. All add-ons are confirmed at project initiation.
Food Plot Services Food Plot Soil Testing & Management

Tier 1 base pricing applies. The following add-ons are available for food plot engagements:

  • Annual Plot Management Report: +$40 per plot per year
  • No-till drilling: $95–$125/acre, 3-acre minimum
  • Spring Food Plot Special: $75 flat for single plots ≤1 acre — seasonal promotional rate
Compaction Testing Soil Compaction Analysis

Included standard at Tier 2 and above. Available as a Tier 1 add-on at +$5 per sample point. Co-located with soil sample points — one navigation stop per location.

Rush Processing Expedited Turnaround
  • Tier 1: +$200 or +25% (whichever greater)
  • Tier 2: +$300 or +25% (whichever greater)
  • Tier 3: +$500 or +25% (whichever greater)
  • Tiers 4–5: Custom — confirm at project initiation
Discounts & Payment Volume Discounts & Credits Discounts apply to the total project cost. Credits apply to future services. Cannot be combined except where noted.
10% Multiple Properties Same client, scheduled within 3 months of each other
15% Annual Contract Pre-committed schedule for the calendar year
$100 Referral Credit Per successful referral, applied to future services. No limit.
$225 Tier 0 Credit Applied toward Tier 3, 4, or 5 if booked within 6 months of screening
Payment Terms Payment Structure
Tiers 1–3
  • 50% deposit at project initiation
  • 50% balance upon deliverable completion
  • Digital deliverables released upon final payment
Tiers 4–5
  • 50% deposit at project initiation
  • 25% due upon Tier 3 data completion
  • 25% balance upon final report delivery
Ready to get started? Contact us to discuss your property, confirm your acreage band, and schedule your service. Request a Consultation Learn About Our Capabilities